New In-Air Assembly Area

Unit 3, the new In-Air Assembly area, has recently been upgraded as part of the factory improvement.

The assembly area, along with bake out equipment, has been relocated from Unit 2 and now includes a newly installed 5 tonne overhead crane.

IMG_1459IMG_3278IMG_3281